Ionia, MI interconnection queue

4 active projects totaling 796 MW in the MISO queue, plus 10 with terminal status (shown grayed).

4active projects
796active MW
14total filed
Queue IDProjectkVMWResourceStatus
J1064 Not reported 138 200 Wind Withdrawn
J1255 Not reported 138 200 Solar Active
J1403 Not reported 138 200 Solar Withdrawn
J2774 Not reported n/r 200 Solar Withdrawn
J3220 Not reported n/r 200 Battery Withdrawn
J3545 Not reported 138 200 Solar Active
J1292 Not reported 138 198 Wind Active
J4055 Not reported n/r 198 Wind Active
J1554 Not reported 138 150 Solar Withdrawn
J2279 Not reported 138 150 Hybrid Withdrawn
J921 Not reported 138 146.7 Wind Withdrawn
J2725 Not reported 138 100 Solar Withdrawn
G216 CONS 90 Not reported n/r 80 Other Withdrawn
J1327 Not reported 138 20 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.