Substation Scout

Independence, AR interconnection queue

2 active projects totaling 750 MW in the MISO queue, plus 3 with terminal status (shown grayed).

2active projects
750active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2841 Not reported 500 500 Wind Active
J2523 Not reported n/r 250 Solar Active
J1811 Not reported 161 150 Solar Withdrawn
J2409 Not reported 500 150 Battery Withdrawn
J387 Not reported 161 103 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first