Substation Scout

Ida, IA interconnection queue

2 active projects totaling 500 MW in the MISO queue.

2active projects
500active MW
2total filed
Queue IDProjectkVMWResourceStatus
J411 Not reported 345 300 Wind Operational
J412 Not reported 345 200 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.