Substation Scout

Iberville Parish, LA interconnection queue

6 active projects totaling 3,417.2 MW in the MISO queue, plus 8 with terminal status (shown grayed).

6active projects
3,417.2active MW
14total filed
Queue IDProjectkVMWResourceStatus
J4109 Not reported 230 1,300 Gas Withdrawn
J4138 Not reported n/r 805 Gas Active
J4191 Not reported n/r 805 Gas Active
J1246 Not reported 500 725.2 Gas Active
J4166 Not reported 500 710 Gas Withdrawn
J4190 Not reported n/r 707 Gas Active
J1073 Not reported 500 300 Solar Withdrawn
J567 Not reported n/r 201.5 Solar Withdrawn
J1099 Not reported 230 200 Solar Withdrawn
J2224 Not reported 230 200 Solar Active
J1668 Not reported 230 194 Solar Withdrawn
J1583 Not reported 230 175 Solar Active
J2210 Not reported 230 100 Battery Withdrawn
J2220 Not reported 230 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first