Substation Scout

Humboldt, IA interconnection queue

2 active projects totaling 425 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
425active MW
4total filed
Queue IDProjectkVMWResourceStatus
J534 Not reported 345 250 Wind Operational
J2988 Not reported 345 175 Wind Active
J2256 Not reported 345 150 Wind Withdrawn
J840 Not reported 345 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.