Houghton, MI interconnection queue
0 active projects totaling 0 MW in the MISO queue, plus 9 with terminal status (shown grayed).
0active projects
0active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3649 | Not reported | n/r | 200 | Hybrid | Withdrawn |
| G799 | Not reported | 69 | 120 | Wind | Withdrawn |
| J1809 | Not reported | 138 | 62.5 | Solar | Withdrawn |
| J1823 | Not reported | 69 | 62.5 | Solar | Withdrawn |
| J1244 | Not reported | 69 | 38.4 | Wind | Withdrawn |
| J1792 | Not reported | 69 | 22.5 | Solar | Withdrawn |
| J1817 | Not reported | 69 | 20 | Wind | Withdrawn |
| J543 | Not reported | n/r | 19.5 | Other | Withdrawn |
| J1803 | Not reported | 69 | 1.6 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.