Hot Spring, AR interconnection queue

2 active projects totaling 875 MW in the MISO queue, plus 5 with terminal status (shown grayed).

2active projects
875active MW
7total filed
Queue IDProjectkVMWResourceStatus
J3829 Not reported n/r 770 Gas Active
J4111 Not reported 500 650 Gas Withdrawn
J2717 Not reported 500 600 Hybrid Withdrawn
J3023 Not reported 500 400 Battery Withdrawn
J2623 Not reported 115 125 Solar Withdrawn
J3081 Not reported 115 105 Solar Active
J3193 Not reported 115 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.