Henry, IN interconnection queue

2 active projects totaling 250 MW in the MISO queue, plus 10 with terminal status (shown grayed).

2active projects
250active MW
12total filed
Queue IDProjectkVMWResourceStatus
H013 Not reported 138 200 Wind Withdrawn
J1031 Not reported 138 150 Wind Withdrawn
J1689 Not reported 138 150 Solar Withdrawn
J3387 Not reported 138 150 Battery Active
J4008 Not reported 138 150 Solar Withdrawn
J1690 Not reported 138 125 Solar Withdrawn
J903 Not reported 138 100 Solar Active
J3608 Not reported n/r 77.6 Solar Withdrawn
J851 Not reported 138 50 Wind Withdrawn
J3607 Not reported n/r 47.4 Solar Withdrawn
J1784 Not reported 69 39 Solar Withdrawn
J1806 Not reported 345 30 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.