Hendricks, IN interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2259 Not reported 345 200 Solar Withdrawn
J2843 Not reported 345 110 Wind Withdrawn
J1385 Not reported 138 100 Solar Withdrawn
J3339 Not reported n/r 100 Battery Withdrawn
J2894 Not reported 69 22.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.