Substation Scout

Hardin, IA interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1865 Not reported 345 250 Wind Withdrawn
J2989 Not reported 345 200 Wind Active
J873 Not reported 345 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first