Substation Scout

Hancock, IN interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
J2687 Not reported 345 300 Hybrid Withdrawn
J2650 Not reported 345 236 Hybrid Withdrawn
J1152 Not reported 345 200 Solar Withdrawn
J3347 Not reported 138 140 Solar Withdrawn
J1116 Not reported 138 100 Wind Withdrawn
J3789 Not reported n/r 77 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first