Substation Scout

Hancock, IL interconnection queue

1 active project totaling 127 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
127active MW
3total filed
Queue IDProjectkVMWResourceStatus
G775 Not reported 138 200 Wind Withdrawn
J3820 Not reported n/r 127 Wind Active
J1242 Not reported 69 25 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first