Hamilton, IL interconnection queue

3 active projects totaling 540 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3active projects
540active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3269 Not reported 345 300 Solar Withdrawn
J3296 Not reported n/r 200 Battery Active
J3338 Not reported 345 200 Wind Active
J2962 Not reported 138 150 Hybrid Withdrawn
J3611 Not reported 345 140 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.