3 active projects totaling 513.8 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3active projects
513.8active MW
5total filed
Queue IDProjectkVMWResourceStatus
E0052 Pumpkin Patch n/r 203.8 Solar Active
J3718 Not reported n/r 200 Solar Active
J644 Not reported 138 110 Solar Active
J2355 Not reported n/r 70 Solar Withdrawn
J3398 Not reported 69 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.