Greene, IA interconnection queue

3 active projects totaling 164 MW in the MISO queue, plus 7 with terminal status (shown grayed).

3active projects
164active MW
10total filed
Queue IDProjectkVMWResourceStatus
R62 Not reported 345 300 Wind Withdrawn
R61 Not reported 161 200 Wind Withdrawn
J3148 Not reported n/r 131 Solar Withdrawn
J1313 Not reported 161 100 Solar Active
H096 Not reported 161 50 Wind Operational
J093 Not reported 161 50 Wind Withdrawn
J118 Not reported 161 50 Wind Withdrawn
J2445 Not reported 161 50 Solar Withdrawn
J092 Not reported n/r 20 Wind Withdrawn
G530 Not reported 34.5 14 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.