Greene, AR interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 5 with terminal status (shown grayed).

1active projects
200active MW
6total filed
Queue IDProjectkVMWResourceStatus
J2298 Not reported n/r 200 Solar Active
J4035 Not reported 115 113 Solar Withdrawn
J2299 Not reported n/r 100 Solar Withdrawn
J3578 Not reported n/r 100 Solar Withdrawn
J3675 Not reported 115 100 Solar Withdrawn
J2300 Not reported n/r 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.