Substation Scout

Green, WI interconnection queue

4 active projects totaling 334.9 MW in the MISO queue, plus 8 with terminal status (shown grayed).

4active projects
334.9active MW
12total filed
Queue IDProjectkVMWResourceStatus
J1753 Not reported 345 300 Solar Withdrawn
J3152 Not reported n/r 160 Gas Active
J738 Not reported n/r 150 Wind Withdrawn
G281 Not reported n/r 130 Wind Withdrawn
J1706 Not reported 138 100 Solar Active
J1711 Not reported 138 100 Solar Withdrawn
J825 Not reported 138 99.9 Wind Withdrawn
J584 Not reported 69 60 Wind Withdrawn
G483 Not reported 69 50 Wind Withdrawn
J1127 Not reported 138 49.9 Solar Withdrawn
J1305 Not reported 138 49.9 Solar Operational
S1033 Surplus; J1305 138 25 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first