0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3746 | Not reported | 230 | 250 | Hybrid | Withdrawn |
| J2770 | Not reported | 230 | 125 | Solar | Withdrawn |
| J324 | Not reported | 230 | 36.2 | Hydro | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.