Grant, MN interconnection queue

1 active project totaling 20 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
20active MW
5total filed
Queue IDProjectkVMWResourceStatus
J1038 Not reported 115 32.5 Solar Withdrawn
G474 Not reported 41.6 20 Wind Operational
G818 Not reported 115 20 Wind Withdrawn
G778 Not reported 41.6 5.9 Wind Withdrawn
G817 Not reported 115 5.9 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.