Grant, AR interconnection queue

5 active projects totaling 940 MW in the MISO queue, plus 3 with terminal status (shown grayed).

5active projects
940active MW
8total filed
Queue IDProjectkVMWResourceStatus
J2907 Not reported 500 400 Hybrid Active
J2134 Not reported 115 200 Solar Active
J2983 Not reported 115 140 Solar Active
J1577 Not reported 115 100 Solar Active
J2072 Not reported 115 100 Hybrid Withdrawn
J3481 Not reported n/r 100 Solar Active
J3788 Not reported 115 100 Solar Withdrawn
J2993 Not reported 115 80 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.