Substation Scout

Gladwin, MI interconnection queue

3 active projects totaling 295 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3active projects
295active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2719 Not reported 138 200 Solar Withdrawn
J2675 Not reported 138 170 Solar Active
J1932 Not reported n/r 100 Solar Active
J1982 Not reported n/r 25 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first