Substation Scout

Gibson, IN interconnection queue

7 active projects totaling 1,430 MW in the MISO queue, plus 9 with terminal status (shown grayed).

7active projects
1,430active MW
16total filed
Queue IDProjectkVMWResourceStatus
J3834 Not reported 345 300 Battery Active
J1295 Not reported 345 280 Solar Operational
J3077 Not reported 138 250 Hybrid Active
J1074 Not reported 138 200 Solar Withdrawn
J1296 Not reported 138 200 Solar Withdrawn
J3873 Not reported n/r 200 Battery Active
J842 Not reported 345 200 Wind Withdrawn
J843 Not reported 345 200 Wind Withdrawn
J1388 Not reported 138 150 Solar Active
J3733 Not reported 138 150 Hybrid Active
G940 Not reported n/r 105 Gas Withdrawn
J3983 Not reported n/r 100 Hybrid Active
J1950 Not reported 138 83.2 Solar Withdrawn
G257 Not reported n/r 83 Other Withdrawn
J1016 Not reported 138 50 Solar Withdrawn
J1981 Not reported 138 15 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first