Substation Scout

Gasconade, MO interconnection queue

2 active projects totaling 440 MW in the MISO queue.

2active projects
440active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3518 Not reported n/r 300 Battery Active
J2593 Not reported 138 140 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first