Franklin, IL interconnection queue

3 active projects totaling 1,050 MW in the MISO queue, plus 4 with terminal status (shown grayed).

3active projects
1,050active MW
7total filed
Queue IDProjectkVMWResourceStatus
IP17 Not reported n/r 550 Coal Active
J3728 Not reported 138 400 Battery Withdrawn
J2647 Not reported 345 300 Battery Active
J3563 Not reported 345 200 Solar Withdrawn
J3729 Not reported n/r 200 Battery Active
J2331 Not reported 345 127 Solar Withdrawn
J2926 Not reported n/r 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.