Ford, IL interconnection queue

8 active projects totaling 1,308.1 MW in the MISO queue, plus 9 with terminal status (shown grayed).

8active projects
1,308.1active MW
17total filed
Queue IDProjectkVMWResourceStatus
J3412 Not reported n/r 300 Solar Active
J4018 Not reported n/r 250 Wind Active
J3095 Not reported 138 200 Solar Active
J108 Not reported 138 165 Wind Withdrawn
G996 Not reported 138 150 Wind Operational
S1041 Surplus; J33/J734 n/r 135 Hybrid Active
J375 Not reported 138 124 Wind Withdrawn
J845 Not reported 138 120 Wind Operational
G966 Not reported 138 100 Wind Withdrawn
J002 Not reported 138 100 Wind Withdrawn
J121 Not reported n/r 100 Wind Withdrawn
J260 Not reported 138 100 Wind Withdrawn
J339 Not reported n/r 96 Gas Operational
J105 Not reported 138 80 Wind Withdrawn
G512 Not reported 138 70 Gas Withdrawn
G432 Not reported n/r 65 Wind Withdrawn
J734 Not reported n/r 57.1 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.