Substation Scout

Fillmore, MN interconnection queue

1 active project totaling 50 MW in the MISO queue, plus 7 with terminal status (shown grayed).

1active projects
50active MW
8total filed
Queue IDProjectkVMWResourceStatus
G746 Not reported 161 200 Wind Withdrawn
G890 Not reported 161 200 Wind Withdrawn
G991 Not reported 161 200 Wind Withdrawn
J141 Not reported 161 200 Wind Withdrawn
J2863 Not reported n/r 125 Solar Withdrawn
J140 Not reported 161 100 Wind Withdrawn
J718 Not reported 69 50 Solar Active
J136 Not reported 69 40 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first