Substation Scout

Faribault, MN interconnection queue

4 active projects totaling 486 MW in the MISO queue, plus 9 with terminal status (shown grayed).

4active projects
486active MW
13total filed
Queue IDProjectkVMWResourceStatus
J2419 Not reported 345 300 Battery Withdrawn
G670 Not reported 161 200 Wind Withdrawn
J761 Not reported 345 200 Wind Withdrawn
J876 Not reported 345 200 Wind Withdrawn
J1503 Not reported n/r 150 Solar Active
J1504 Not reported n/r 150 Solar Active
J1572 Not reported 161 150 Hybrid Active
J1228 Not reported 161 100 Solar Withdrawn
J927 Not reported 69 100 Wind Withdrawn
J2420 Not reported 345 95 Solar Withdrawn
G109 Not reported n/r 50 Other Withdrawn
J1008 Not reported 69 50 Solar Withdrawn
G358 Not reported 161 36 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first