Substation Scout

Evangeline Parish, LA interconnection queue

3 active projects totaling 450 MW in the MISO queue, plus 9 with terminal status (shown grayed).

3active projects
450active MW
12total filed
Queue IDProjectkVMWResourceStatus
J1384 Not reported 230 200 Solar Withdrawn
J2135 Not reported 230 200 Solar Withdrawn
J2322 Not reported 138 200 Solar Active
J3238 Not reported 230 155 Solar Withdrawn
J1286 Not reported 138 150 Solar Active
J1796 Not reported 138 150 Solar Withdrawn
J2467 Not reported 138 105 Solar Withdrawn
J1686 Not reported 138 100 Hybrid Active
J1908 Not reported n/r 100 Battery Withdrawn
J2424 Not reported 138 100 Battery Withdrawn
J2257 Not reported 230 80 Solar Withdrawn
J1290 Not reported 138 25 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.