Emmons, ND interconnection queue

4 active projects totaling 285 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4active projects
285active MW
8total filed
Queue IDProjectkVMWResourceStatus
J302 Not reported 230 101.2 Wind Operational
J503 Not reported 230 98.8 Wind Operational
J741 Not reported 115 51 Wind Withdrawn
J779 Not reported 115 51 Wind Withdrawn
J2084 Not reported n/r 45 Solar Withdrawn
J4077 Not reported n/r 45 Solar Active
J2085 Not reported 115 40 Solar Withdrawn
J4070 Not reported n/r 40 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.