Emmet, IA interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
J462 Not reported n/r 598.4 Wind Withdrawn
J439 Not reported 345 500 Wind Withdrawn
G957 Not reported n/r 300 Wind Withdrawn
G614 Not reported 161 200 Wind Withdrawn
G730 Not reported n/r 73.5 Wind Withdrawn
G552 Not reported 69 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.