Substation Scout

Eaton, MI interconnection queue

4 active projects totaling 928 MW in the MISO queue, plus 8 with terminal status (shown grayed).

4active projects
928active MW
12total filed
Queue IDProjectkVMWResourceStatus
J3992 Not reported 345 400 Battery Active
J3836 Not reported n/r 250 Battery Active
J1322 Not reported 345 200 Solar Withdrawn
J4043 Not reported n/r 178 Solar Active
J1307 Not reported 345 150 Solar Withdrawn
J820 Not reported 345 100.1 Wind Withdrawn
J225 Not reported 115 100 Wind Withdrawn
J4128 Not reported n/r 100 Battery Active
J1083 Not reported 138 70 Solar Withdrawn
J1178 Not reported 138 65 Solar Withdrawn
J2583 Not reported 138 50 Solar Withdrawn
J1192 Not reported 138 35 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.