Eaton, MI interconnection queue
4 active projects totaling 928 MW in the MISO queue, plus 8 with terminal status (shown grayed).
4active projects
928active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3992 | Not reported | 345 | 400 | Battery | Active |
| J3836 | Not reported | n/r | 250 | Battery | Active |
| J1322 | Not reported | 345 | 200 | Solar | Withdrawn |
| J4043 | Not reported | n/r | 178 | Solar | Active |
| J1307 | Not reported | 345 | 150 | Solar | Withdrawn |
| J820 | Not reported | 345 | 100.1 | Wind | Withdrawn |
| J225 | Not reported | 115 | 100 | Wind | Withdrawn |
| J4128 | Not reported | n/r | 100 | Battery | Active |
| J1083 | Not reported | 138 | 70 | Solar | Withdrawn |
| J1178 | Not reported | 138 | 65 | Solar | Withdrawn |
| J2583 | Not reported | 138 | 50 | Solar | Withdrawn |
| J1192 | Not reported | 138 | 35 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.