Substation Scout

East Feliciana Parish, LA interconnection queue

3 active projects totaling 477 MW in the MISO queue, plus 4 with terminal status (shown grayed).

3active projects
477active MW
7total filed
Queue IDProjectkVMWResourceStatus
J1421 Not reported 230 300 Solar Active
J1029 Not reported 230 200 Solar Withdrawn
J3019 Not reported 230 180 Hybrid Withdrawn
J3128 Not reported 138 100 Solar Active
J3630 Not reported 230 77 Hybrid Active
J3129 Not reported 138 50 Battery Withdrawn
J553 Not reported 69 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first