Substation Scout

Drew, AR interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3171 Not reported 115 300 Solar Withdrawn
J3773 Not reported 115 265 Solar Withdrawn
J4197 Not reported 115 200 Solar Withdrawn
J2622 Not reported 115 107 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first