Douglas, MN interconnection queue

1 active project totaling 39.5 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
39.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3025 Not reported 115 188 Solar Withdrawn
J1108 Not reported 345 150 Solar Withdrawn
H073 Not reported 115 100 Wind Withdrawn
J019 Not reported 115 100 Wind Withdrawn
J2276 Not reported n/r 39.5 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first