Dodge, WI interconnection queue

4 active projects totaling 404 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4active projects
404active MW
8total filed
Queue IDProjectkVMWResourceStatus
G306 Not reported n/r 200 Other Withdrawn
G368 Not reported 138 200 Wind Operational
J1171 Not reported 138 100 Solar Active
G485 Not reported n/r 60 Wind Withdrawn
G338 Not reported 138 54 Wind Operational
J1003 Not reported 69 50 Solar Operational
J1345 Not reported 69 25 Battery Withdrawn
J765 Not reported n/r 4.3 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.