0 active projects
totaling 0 MW in the MISO queue, plus 7 with terminal status (shown grayed).
0active projects
0active MW
7total filed
Queue ID
Project
kV
MW
Resource
Status
J2113
Not reported
161
200
Solar
Withdrawn
J2016
Not reported
n/r
100
Battery
Withdrawn
J2017
Not reported
138
100
Solar
Withdrawn
J2480
Not reported
161
75
Battery
Withdrawn
J2147
Not reported
69
56
Solar
Withdrawn
J3794
Not reported
69
50
Hybrid
Withdrawn
J2820
Not reported
69
35
Hybrid
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.