Substation Scout

Dallas, IA interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J162 Not reported 161 270 Hybrid Withdrawn
J3655 Not reported 345 200 Wind Active
J998 Not reported 69 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first