Crittenden, AR interconnection queue

11 active projects totaling 2,830 MW in the MISO queue, plus 15 with terminal status (shown grayed).

11active projects
2,830active MW
26total filed
Queue IDProjectkVMWResourceStatus
J2477 Not reported 500 600 Solar Active
J2090 Not reported 161 300 Solar Withdrawn
J2482 Not reported 500 300 Solar Active
J4012 Not reported 161 300 Hybrid Active
J4074 Not reported n/r 300 Solar Active
J2028 Not reported n/r 250 Solar Withdrawn
J1007 Not reported 161 200 Solar Active
J1469 Not reported 161 200 Solar Withdrawn
J2596 Not reported 500 200 Solar Withdrawn
J3090 Not reported n/r 200 Solar Active
J3122 Not reported 161 200 Hybrid Active
J3230 Not reported 161 200 Hybrid Active
J934 Not reported 161 200 Solar Active
S1094 Surplus; J1007 n/r 180 Battery Active
J1156 Not reported 161 150 Solar Withdrawn
J1364 Not reported 161 150 Solar Withdrawn
J1400 Not reported 161 150 Wind Withdrawn
J2734 Not reported 161 150 Hybrid Active
J2093 Not reported 161 144 Solar Withdrawn
J662 Not reported 161 100.1 Wind Withdrawn
J2110 Not reported 161 100 Solar Withdrawn
J2111 Not reported 161 100 Solar Withdrawn
J2528 Not reported 161 100 Battery Withdrawn
J2597 Not reported 500 100 Battery Withdrawn
J2978 Not reported 500 100 Battery Withdrawn
J666 Not reported n/r 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.