Craighead, AR interconnection queue

3 active projects totaling 800 MW in the MISO queue, plus 16 with terminal status (shown grayed).

3active projects
800active MW
19total filed
Queue IDProjectkVMWResourceStatus
J2478 Not reported 500 550 Solar Active
J2399 Not reported 500 500 Solar Withdrawn
J3626 Not reported 500 500 Solar Withdrawn
J3110 Not reported 500 400 Hybrid Withdrawn
J2356 Not reported 161 200 Hybrid Withdrawn
J2394 Not reported 500 200 Hybrid Withdrawn
J3300 Not reported 161 200 Solar Withdrawn
J3459 Not reported 161 200 Solar Withdrawn
J3627 Not reported 161 200 Solar Withdrawn
J2398 Not reported 500 160 Hybrid Withdrawn
J1091 Not reported 161 150 Solar Withdrawn
J2764 Not reported 161 150 Hybrid Active
J3621 Not reported 161 150 Solar Withdrawn
J3622 Not reported 161 150 Battery Withdrawn
J942 Not reported 161 107 Solar Withdrawn
J656 Not reported n/r 101.5 Solar Withdrawn
J3111 Not reported 161 100 Hybrid Active
J3599 Not reported n/r 60 Solar Withdrawn
J347 Not reported n/r 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.