Substation Scout

Columbiana, OH interconnection queue

1 active project totaling 560 MW in the MISO queue.

1active projects
560active MW
1total filed
Queue IDProjectkVMWResourceStatus
G689 Not reported 345 560 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first