Substation Scout

Coahoma, MS interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 5 with terminal status (shown grayed).

1active projects
200active MW
6total filed
Queue IDProjectkVMWResourceStatus
J4073 Not reported 115 200 Solar Active
J1988 Not reported 115 121 Solar Withdrawn
J2428 Not reported 115 100 Solar Withdrawn
J2771 Not reported 230 100 Hybrid Withdrawn
J1957 Not reported 115 90 Solar Withdrawn
J2284 Not reported 115 66 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first