Substation Scout

Clay, AR interconnection queue

2 active projects totaling 300 MW in the MISO queue, plus 8 with terminal status (shown grayed).

2active projects
300active MW
10total filed
Queue IDProjectkVMWResourceStatus
J4027 Not reported 161 250 Wind Withdrawn
J2351 Not reported 161 200 Solar Active
J3117 Not reported n/r 200 Hybrid Withdrawn
J1414 Not reported 161 150 Solar Withdrawn
J2984 Not reported 161 150 Solar Withdrawn
J3617 Not reported n/r 150 Solar Withdrawn
J3618 Not reported n/r 150 Battery Withdrawn
J2954 Not reported 161 100 Solar Active
J2996 Not reported 161 50 Battery Withdrawn
J1250 Not reported 161 35 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.