Substation Scout

Clark, IN interconnection queue

2 active projects totaling 400 MW in the MISO queue, plus 5 with terminal status (shown grayed).

2active projects
400active MW
7total filed
Queue IDProjectkVMWResourceStatus
J2538 Not reported 345 200 Solar Active
J2586 Not reported n/r 200 Battery Active
J2539 Not reported 345 150 Solar Withdrawn
J2895 Not reported 138 120 Hybrid Withdrawn
J2221 Not reported n/r 100 Solar Withdrawn
J2542 Not reported 138 100 Solar Withdrawn
J2582 Not reported 138 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.