0 active projects totaling 0 MW in the MISO queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
J3304 Not reported 500 350 Solar Withdrawn
J3658 Not reported 115 150 Hybrid Withdrawn
J688 Not reported n/r 92 Solar Withdrawn
J2636 Not reported 115 78.5 Solar Withdrawn
J508 Not reported 115 42.7 Gas Withdrawn
J685 Not reported n/r 30 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.