Substation Scout

Clare, MI interconnection queue

1 active project totaling 225 MW in the MISO queue.

1active projects
225active MW
1total filed
Queue IDProjectkVMWResourceStatus
J2673 Not reported 138 225 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.