Chippewa, MI interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3514 Not reported 69 100 Solar Withdrawn
J119 Not reported 69 61.2 Wind Withdrawn
J066 Not reported 69 60 Wind Withdrawn
J147 Not reported n/r 60 Wind Withdrawn
J1370 Not reported 69 50 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.