Chicot, AR interconnection queue
3 active projects totaling 485 MW in the MISO queue, plus 9 with terminal status (shown grayed).
3active projects
485active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3426 | Not reported | n/r | 500 | Solar | Withdrawn |
| J2143 | Not reported | 115 | 250 | Solar | Active |
| J2850 | Not reported | 230 | 250 | Solar | Withdrawn |
| J2451 | Not reported | 230 | 200 | Solar | Withdrawn |
| J698 | Not reported | 115 | 150 | Solar | Withdrawn |
| J2985 | Not reported | 115 | 135 | Solar | Active |
| J2941 | Not reported | 115 | 100 | Solar | Withdrawn |
| J620 | Not reported | 115 | 100 | Solar | Operational |
| J922 | Not reported | 115 | 100 | Solar | Withdrawn |
| J2644 | Not reported | 115 | 90 | Solar | Withdrawn |
| J2995 | Not reported | 115 | 80 | Battery | Withdrawn |
| J350 | Not reported | 115 | 50 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.