Substation Scout

Chickasaw, IA interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1181 Not reported 345 200 Wind Operational
J531 Not reported 345 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first