Cheboygan, MI interconnection queue

2 active projects totaling 201.8 MW in the MISO queue, plus 4 with terminal status (shown grayed).

2active projects
201.8active MW
6total filed
Queue IDProjectkVMWResourceStatus
G212 CONS 105 Not reported n/r 200 Other Withdrawn
J1929 Not reported n/r 110 Solar Active
J3668 Not reported 138 100 Solar Withdrawn
J3692 Not reported 138 100 Battery Withdrawn
J832 Not reported 138 100 Solar Withdrawn
J3777 Not reported 138 91.8 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.