Substation Scout

Cape Girardeau, MO interconnection queue

2 active projects totaling 450 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
450active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1059 Not reported 345 300 Solar Withdrawn
J3352 Not reported n/r 250 Battery Active
J1107 Not reported 345 200 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first